89.9k views
5 votes
Carly’s bake shop requires 3.5 hours of labor to produce one cake and 2 hours of labor to produce one pie, and the shop has a maximum of 70 total labor hours available. If X1 represents number of cakes and X2 represents number of pies, how would this constraint be written?

1 Answer

6 votes

Explanation:

3.5 hours for 1 cake means 3.5 hours per cake.

similar : 2 hours for 1 pie means 2 hours per pie.

so, if there are e.g. 3 pies, they take 3×2 = 6 hours.

therefore the general constraint is

3.5x1 + 2x2 <= 70

I think the names "x1" and "x2" are confusing when writing this inequality.

I prefer to use x and y.

and then it would look like

3.5x + 2y <= 70

User DGDD
by
4.2k points