Final answer:
To calculate the required amount of HMA, the volume of the project space is needed along with the material's weight per cubic foot to determine the total weight of HMA necessary.
Step-by-step explanation:
The student's question relates to calculating the quantity of Hot Mix Asphalt (HMA) required for a project, given the weight of the material per cubic foot. To determine the amount of HMA needed, we first need the volume that the project will occupy. Then, we use the weight per cubic foot to convert this volume into the corresponding weight, which would tell us how much HMA we need to order. Without the project volume, we cannot calculate the exact quantity of HMA required.