167k views
0 votes
How far should the chute of a ready-mix truck be from the ground when pouring concrete?

User Gareth
by
7.2k points

1 Answer

3 votes

Final answer:

The height of the chute of a ready-mix truck when pouring concrete depends on the height at which the concrete needs to be poured, the angle at which the chute is positioned, and the distance between the truck and the pouring area. The chute should be positioned at a height that allows the concrete to flow smoothly into the desired location without splashing or excess turbulence. The exact height should be determined by experienced professionals based on the specific pouring task.

Step-by-step explanation:

The height of the chute of a ready-mix truck when pouring concrete depends on the height at which the concrete needs to be poured, the angle at which the chute is positioned, and the distance between the truck and the pouring area. Generally, the chute should be positioned at a height that allows the concrete to flow smoothly into the desired location without splashing or excess turbulence. It is important to ensure that the concrete reaches the desired location without causing any damage or safety hazards.

For example, if the concrete needs to be poured onto the ground, the chute should be positioned close to the ground to minimize the distance the concrete falls and reduce the chances of it splashing or creating excess turbulence. On the other hand, if the concrete needs to be poured into a higher location, such as a second floor, the chute should be positioned higher to allow the concrete to flow upwards.

Ultimately, the exact height at which the chute should be positioned depends on the specific requirements of the pouring task and should be determined by experienced professionals who can assess the situation and make appropriate adjustments for a safe and efficient pour.

User Rdamborsky
by
8.3k points