Final answer:
The total materials cost for production is the sum of direct and indirect materials, which is $39,000 + $6,000, totaling $45,000. The correct answer is B) $45,000.
Step-by-step explanation:
The total materials cost for production can be calculated by adding the direct materials and indirect materials costs together. In this case, the direct materials cost is $39,000 and the indirect materials cost is $6,000. To find the total materials cost, you simply add the two amounts:
- Direct materials: $39,000
- Indirect materials: $6,000
Total materials cost = Direct materials + Indirect materials
= $39,000 + $6,000
= $45,000
Therefore, the correct answer is B) $45,000.
.