In the event of a change in the placement of air-conditioning ducts in a boardroom, which of the following documents should the AV integrator submit first?

1 Answer

1 vote

Final answer:

When changing the placement of air-conditioning ducts, the AV integrator should first submit a revised mechanical drawing that reflects the new HVAC system layout in relation to the AV equipment.

Step-by-step explanation:

In the event of a change in the placement of air-conditioning ducts in a boardroom, the AV integrator should submit a revised mechanical drawing or schematic first. This document should accurately detail the new layout of the HVAC (Heating, Ventilation, and Air Conditioning) system in relation to the audiovisual equipment and other pertinent features within the room. It's essential that the drawing reflects all changes to be compliant with the relevant codes and to ensure proper integration with the AV system's layout.