Which employees are allowed under the pre-cast concrete members while they are being lifted or tilted into position?

1) Employees that have worked with concrete in the past
2) Employees that are required for the setup
3) Employees that are working on the same job site
4) Supervisors

1 Answer

5 votes

Final answer:

The employees allowed under the pre-cast concrete members include those who have prior experience with concrete, those required for setup, employees on the same job site, and supervisors.

Step-by-step explanation:

The employees allowed under the pre-cast concrete members while they are being lifted or tilted into position include:

  1. Employees that have worked with concrete in the past: These employees have the necessary knowledge and experience to handle concrete safely during the lifting or tilting process.
  2. Employees that are required for the setup: These employees are directly involved in the setup process and are essential for ensuring the proper positioning and alignment of the concrete members. They are trained to work in coordination with the lifting equipment.
  3. Employees that are working on the same job site: These employees are already present at the job site and can support the lifting and tilting process by providing assistance and ensuring a safe working environment.

Supervisors, who oversee the entire operation and ensure safety protocols are followed, are also allowed under the pre-cast concrete members during lifting or tilting.