211k views
0 votes
Which cable assembly on the Intellicheck2® and Intellitrol® Overfill Prevention Control Systems connects to the refueler for filling operations?

User Joash
by
7.6k points

1 Answer

3 votes

Final answer:

The LOAD cable connects the Intellicheck2® and Intellitrol® Overfill Prevention Control Systems to the refueler for filling operations.

Step-by-step explanation:

The cable assembly on the Intellicheck2® and Intellitrol® Overfill Prevention Control Systems that connects to the refueler for filling operations is the LOAD cable.

User Diogo Cardoso
by
8.1k points