In an assembly line of a factory that makes gears, it takes fifteen minutes to complete a drilling operation using a lathe. The duration of this operation is called _____ time.

a. delay
b. queue
c. processing
d. standard

1 Answer

3 votes

Final answer:

The duration of the drilling operation in an assembly line of a factory that makes gears is called processing time.

Step-by-step explanation:

The duration of the drilling operation in an assembly line of a factory that makes gears is called processing time. In this case, it takes fifteen minutes to complete the drilling operation using a lathe. Processing time refers to the time it takes to complete a specific task or operation in a production process.