141k views
3 votes
What is the maximum c-way quota expiration date described by the following statements?

A) 12 months after the application date
B) 16 months after the application date
C) 20 months after the application date
D) 24 months after the application date

1 Answer

5 votes

Final answer:

The question pertains to a legal or regulatory timeframe—specifically, the maximum expiration date of a c-way quota, which is assumed to be 24 months after the application date, as it is the longest period listed among the options provided. Option D

Step-by-step explanation:

The question seems to be related to patent law or intellectual property, specifically regarding the expiration of a c-way quota (likely a term used in a specific legal context, though not a common one). The maximum expiration date would be the longest period mentioned among the options.

Therefore, without additional context indicating a specific rule or exception, it is logical to assume that the correct answer would be:

D) 24 months after the application date

This is because out of all the options provided (12, 16, 20, and 24 months), 24 months is the longest duration, hence the 'maximum' expiration date that has been described by the given options. Option D

User Moika Turns
by
8.0k points