When conducting PAC3 Test Launch, what must you do after you set ELES POWER switch to ON and prior to selecting the respective canister on the RELOAD menu?

User Roskakori
by
8.1k points

1 Answer

3 votes

Final answer:

After turning the ELES POWER switch to ON during a PAC3 Test Launch, checking the electrical continuity of all circuits as prescribed by the SOP is the necessary step before selecting the canister on the RELOAD menu.

Step-by-step explanation:

When conducting a PAC3 Test Launch, after setting the ELES POWER switch to ON, it is important to check the electrical continuity of all circuits. This step ensures that there are no open circuits or shorts that could adversely affect the test launch procedure. Prior to selecting the respective canister on the RELOAD menu, there may be a series of checks and calibrations required per the Standard Operating Procedure (SOP) or the established launch protocol to ensure the system is functioning correctly and is ready to proceed with the selection of the canister.

User BoobyTrap
by
8.1k points