Final answer:
The impact of missing the package scrub is increased cost. The total OTR capacity for the station can be calculated by multiplying the number of Flex drivers with their average SPR.
Step-by-step explanation:
The impact of missing the package scrub multiple times is that it increases the cost for the Sort AM station. This is because the MNR items have been in the system for over 6 days, indicating a delay in processing and delivery. As a result, the station might incur additional expenses such as storage costs, customer complaints, and potential loss of business.
To determine the total OTR capacity that the station can dispatch, we need to consider the number of Flex drivers and their average SPR (Stops per Route). With 90 Flex drivers and an average SPR of 42, the total OTR capacity can be calculated by multiplying the number of Flex drivers with their average SPR:
Total OTR capacity = 90 Flex drivers × 42 SPR = 3,780 total OTR capacity.