Final answer:
To find the volume processed during a 6-hour shift, multiply the PPH actual (93) by the number of workers (104) and the shift length (6), resulting in a total of 58,104 pieces processed.
Step-by-step explanation:
The question asks about calculating the total volume of work processed during a 6-hour shift given a Pieces Per Hour (PPH) rate and headcount. To find the volume processed during a 6-hour shift, multiply the PPH actual (93) by the number of workers (104) and the shift length (6), resulting in a total of 58,104 pieces processed.
The PPH rate is 93, and there are 104 people working. To calculate the volume processed, multiply the PPH rate by the headcount and then by the number of hours in the shift.
Volume Processed = PPH actual × Headcount × Shift Length
= 93 × 104 × 6
= 58,104
The total volume processed during the shift is 58,104 pieces.