With Agile project management, instead of trying to plan for everything up front, the _____ of the project evolves.

User Montri M
by
9.0k points

1 Answer

3 votes

Final answer:

With Agile project management, the design of the project evolves instead of planning everything up front. Agile embraces change and allows for continuous improvement and adaptation.

Step-by-step explanation:

With Agile project management, instead of trying to plan for everything up front, the design of the project evolves.

Agile project management is a flexible and iterative approach that allows for continuous improvement and adaptation. Instead of trying to predict and plan every detail of a project in advance, Agile embraces change and allows for the project design to evolve as new information and insights are gained.

This iterative approach is similar to a spiral design process, where changes are made in the design and then the improved design is evaluated. The advantage of this approach is that the end design is often much better than the initial design, as it incorporates feedback and learning along the way.