Final answer:
The maximum recommended time box for Sprint Planning, Sprint Review, and Sprint Retrospective in a Scrum framework varies depending on the length of the sprint.
Step-by-step explanation:
The maximum recommended time box for Sprint Planning, Sprint Review, and Sprint Retrospective in a Scrum framework depends on the length of the sprint. For a one-week sprint, the recommended time box is typically 2 hours each for all three events. For a two-week sprint, the recommended time box is generally 4 hours each. For longer sprints, such as a three or four-week sprint, the recommended time box is often 8 hours each.