70.2k views
5 votes
What is the maximum recommended time box for Sprint Planning, Sprint Review, Sprint Retrospective?

a) 2 hours each
b) 4 hours each
c) 8 hours each
d) No time limit

User Josketres
by
7.6k points

1 Answer

3 votes

Final answer:

The maximum recommended time box for Sprint Planning, Sprint Review, and Sprint Retrospective in a Scrum framework varies depending on the length of the sprint.

Step-by-step explanation:

The maximum recommended time box for Sprint Planning, Sprint Review, and Sprint Retrospective in a Scrum framework depends on the length of the sprint. For a one-week sprint, the recommended time box is typically 2 hours each for all three events. For a two-week sprint, the recommended time box is generally 4 hours each. For longer sprints, such as a three or four-week sprint, the recommended time box is often 8 hours each.

User Rudra Shah
by
7.5k points