Defines the format of the outline and WBS codes.

a) WBS Definition
b) Code Mask
c) Hierarchy Format
d) Outline Structure

1 Answer

3 votes

Final answer:

This detailed answer explains the components of project management related to WBS, including their definitions and purposes: WBS Definition, Code Mask, Hierarchy Format, and Outline Structure.

Step-by-step explanation:

Outline formats and Work Breakdown Structure (WBS) codes are critical components when managing projects. The WBS Definition establishes the hierarchy of project tasks, breaking down the total scope of work into manageable sections. The Code Mask specifies the alphanumeric structure for the unique identification of each element within the WBS, facilitating organization and tracking. Hierarchy Format refers to the visual representation and structural arrangement of the WBS elements, indicating the levels of detail and the relationship between different elements. Finally, the Outline Structure is the arrangement of WBS elements in a way that reflects the sequence and dependency of tasks, often displayed as an indented list.

User Shanqn
by
8.0k points