Technical risks are:

A. Can often be the kind that cause the project to be shut down.
B. Problematic
C. Imposed duration dates
D. Both A and B are correct
E. A, B, and C are all correct

User Pyramation
by
8.0k points

1 Answer

4 votes

Final answer:

Technical risks are related to the engineering or IT aspects of a project and can cause it to be shut down or problematic. The correct option is D, stating that both option A, the risk of shutdown, and B, being problematic, are correct regarding technical risks.

Step-by-step explanation:

Technical risks in project management refer to potential problems or issues specifically related to the engineering or IT aspects of a project. Answer A states that technical risks can shut down a project, which is true, as missing critical deadlines or failing to deliver on technical performance expectations could result in cancellation or significant revenue loss. For instance, if an engineering team fails to complete a video game controller design on time, this could lead to missing a crucial holiday season sales opportunity. Answer B, stating that technical risks are problematic, is also correct, because these risks pose challenges that could disrupt a project's success. However, Answer C relates to 'Imposed duration dates,' which is a project management term but not a technical risk itself. Hence, the correct response is D, 'Both A and B are correct.'

User Pvlt
by
7.9k points