A good project selection model typically contains all of the following except:

The list of available projects.

1. The list of attributes or factors to be used in the selection process.

2. The final budget for each project.

3. the degree of importance or weights assigned to each criteria.

4. All of these are typically contained.

User Grechut
by
7.7k points

1 Answer

0 votes

Final answer:

A good project selection model typically contains a list of available projects, a list of attributes or factors, and the weights assigned to each criteria. The final budget for each project is typically not included in the model.

Step-by-step explanation:

A good project selection model typically contains a list of available projects, a list of attributes or factors to be used in the selection process, the degree of importance or weights assigned to each criteria. The only item that is typically not included in a project selection model is the final budget for each project.