181k views
5 votes
The initial information to determine what the client needs is used as input to which process?

1) Unified Process
2) Agile Process
3) Waterfall Process
4) Scrum Process

User Micbobo
by
7.2k points

1 Answer

5 votes

Final answer:

The initial client needs information inputs into the Waterfall Process in engineering, which involves a sequence of steps starting with problem definition. Other methodologies like Agile, Scrum, and Unified embrace iterative development. The structured approach in the engineering design process includes idea generation and revisiting design problems.

Step-by-step explanation:

The initial information to determine what the client needs is most closely related to the first step in the engineering design process, which is usually to Define the problem. In traditional project management and engineering methodologies, the closest match would be the Waterfall Process, as it is known for its sequential steps that begin with requirements gathering and analysis, then proceed through design, implementation, testing, and maintenance. In contrast, approaches like the Agile Process, Scrum Process, or the Unified Process embrace iterative development, where initial requirements are continuously revisited.

When engineers generate ideas in the design process, they typically use a structured approach to ensure comprehensive exploration of possibilities, which includes steps like mind searches, idea dumps, and brainstorming. The definition and understanding of the design problem often involve techniques such as finding expert information, trying to identify the real problem, and gathering information from customers. The engineering design process is iterative, frequently represented by a spiral design process model, which allows for the refinement of design through multiple cycles of prototyping and evaluation.

User Julien Hoarau
by
7.6k points