Final answer:
The principal system re-engineering activities involve examining the current system, identifying areas for improvement, and implementing changes to optimize performance and efficiency.
Step-by-step explanation:
The principal system re-engineering activities involve examining the current system, identifying areas for improvement, and implementing changes to optimize performance and efficiency. These activities may include:
- Process Analysis: Analyzing current processes to identify bottlenecks and areas for improvement.
- Requirements Gathering: Collecting requirements from stakeholders to understand their needs and expectations.
- System Redesign: Redesigning the system architecture and components to meet the identified requirements and improve overall performance.
- Testing and Validation: Conducting thorough testing to ensure the re-engineered system functions as intended.
- Implementation and Deployment: Rolling out the re-engineered system and ensuring a smooth transition from the old system to the new one.