Answer and Explanation:
The unique difficulty that faced by industries in terms of aircraft manufacturing or ship building that includes the measurement of the capciaty cost that would be distributed each year with respect to the job. The overhead would be distributed to the capacity spent. Also the company find to be difficult for tracking the actual capacity i.e. used in the production of a single aircraft or ship. In this case, the predetermined overhead rate would not be worked.