Jobco Shop uses a single machine to process 10 jobs. Both the processing time and the due date (in days) for each job are given in the following table. The due dates are measured from zero, the assumed start time of the first job. The technical specifications require that if job 4 precedes job 3, then job 9 must precede job 7. The objective of the problem is to determine the job sequence that minimizes the aggregate delay for processing all jobs.Formulate the problem as an ILP (Integer Linear Programming)and find the optimal solution using Python.Jobco Shop uses a single machine to process 10 jobs. Both the processing time and the due date (in days) for each job are given in the following table. The due dates are measured from zero, the assumed start time of the first job. The technical specifications require that if job 4 precedes job 3, then job 9 must precede job 7. The objective of the problem is to determine the job sequence that minimizes the aggregate delay for processing all jobs.Formulate the problem as an ILP (Integer Linear Programming)and find the optimal solution using Python.

1 Answer

4 votes

Final answer:

The question involves creating an ILP model to optimize the job sequencing to minimize delays at Jobco Shop. The model requires defining decision variables, constraints, and an objective function, which can be solved using Python libraries like PuLP.

Step-by-step explanation:

The question pertains to the formulation of an Integer Linear Programming (ILP) problem for the purpose of scheduling jobs to minimize aggregate delay. Specifically, the problem involves determining the optimal job sequence given processing times, due dates, and certain ordering constraints. Using Python for solving an ILP requires setting up decision variables, constraints, and an objective function to minimize total delay.

An ILP model would use binary variables to represent whether a job is completed before another job. Constraints can be set to ensure job precedences are respected, along with the specified technical conditions such as if job 4 comes before job 3, then job 9 must come before job 7. The objective will minimize the sum of all delays, where the delay for each job is the difference between its completion time and its due date if this is positive.

To solve this problem in Python, a library such as PuLP can be used to define the ILP structure and solve for the optimal job sequence.