53.0k views
4 votes
Measure Performance: "What Is the Actual Outcome We Got?"

a) Step 1
b) Step 2
c) Step 3
d) Step 4

User Katerlouis
by
7.4k points

1 Answer

3 votes

Final answer:

The question 'What is the actual outcome we got?' usually pertains to assessing the measurable results of a project or experiment to evaluate its success or to identify areas for improvement.

Step-by-step explanation:

The step "Measure Performance: What is the actual outcome we got?" refers to the stage in a process or plan where you assess the effectiveness of actions or strategies that have been implemented. It generally constitutes one of the latter stages of a project management or scientific research cycle.

In the context of the details provided, this step could align with:

Observing and collecting data during an experiment (Step 1).

Providing measurable results to substantiate outcomes (Step 3).

Drawing conclusions about the effectiveness of a design or experiment based on the results and outcomes (Step 6).

Measurable results and observations are crucial for determining if the initial goals or hypotheses were met or need refinement (Step 3: Refine the design). Outcomes and unexpected results contribute to the iterative process of improving upon the original plan.

User Rahmat
by
8.1k points