Final answer:
The correct answer is option C with a unit variable cost pool of $2,000,000 and a batch-level cost pool of $900,000.
Step-by-step explanation:
The correct answer is option C. The flexible budget amounts for the actual level of machine hours and actual number of setups are: Unit Variable Cost Pool = $2,000,000 and Batch-Level Cost Pool = $900,000.
This means that for the actual level of machine hours, the unit variable cost pool is $2,000,000, and for the actual number of setups, the batch-level cost pool is $900,000.