Final answer:
The total budgeted cost of sold for Meridian Industries in 2016 is $1,700,000.
Step-by-step explanation:
To find the total budgeted cost of sold for Meridian Industries in 2016, we need to calculate the total cost of producing and selling the Prime and Luxuria watches. Firstly, we calculate the total cost of Prime watches by multiplying the quantity sold (3,000 units) by the cost per unit, which is the sum of direct materials, direct labor, and manufacturing overhead per unit. This comes out to be $200 (selling price) + $20 (direct materials) + $40 (direct labor) + $40 (manufacturing overhead) = $300 per unit. Therefore, the total cost of producing and selling Prime watches is 3,000 units x $300 per unit = $900,000. Similarly, the total cost of producing and selling Luxuria watches is 1,000 units x ($500 + $50 + $150 + $100) = $800,000. Adding these two costs together, the total budgeted cost of sold for Meridian Industries in 2016 is $900,000 + $800,000 = $1,700,000.