The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines should be performed in accordance with:

a) International Pipeline Standards
b) Regional Climate Regulations
c) Environmental Protocols
d) National Safety Guidelines

User Helloflash
by
7.7k points

1 Answer

1 vote

Final answer:

The pressure testing of pipelines should be performed in accordance with International Pipeline Standards.

Step-by-step explanation:

The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines should be performed in accordance with International Pipeline Standards. These standards ensure that the pipelines are safe, reliable, and meet the industry requirements. They cover various aspects such as design, construction, operation, and maintenance of the pipelines.

User Phil Carter
by
8.3k points