Ransmission and Distribution line conductors must be joined with full tension splices if the conductors are under tension. Bolted or squeeze-on connections may be used where the line is slack.

True or False?

User Jon Mills
by
8.6k points

1 Answer

2 votes

Final answer:

False. Transmission and distribution line conductors must be joined with full tension splices regardless of whether the conductors are under tension or slack.

Step-by-step explanation:

False. Transmission and distribution line conductors must be joined with full tension splices regardless of whether the conductors are under tension or slack. Bolted or squeeze-on connections should not be used as they may lead to loose connections or poor contact, which can result in power loss, arcing, or damage to the equipment. Full tension splices ensure secure and reliable connections between conductors, especially in high-voltage systems where the forces and stresses on the conductors can be significant.