Answer:
1 job done
Explanation:
Sam can do the job in 20 min. So he can do the whole job at the rate of 1 job in 20 minutes.
So he does 1/20 of the job per minute.
Rob can do the job in 30 min. His rate is 1/30 of the job per minute.
Working together how does it take?
1/20*x + 1/30*x = 1 job done
, where x = minutes.
Multiply everything by 60 go get rid of the fractions.
3x + 2x = 60
5x = 60
.
Divide both sides by 12
x = 12
So our candidate answer is working together it will take them 12 minutes.
Let's check.
In 12 minutes, Sam does 12/20 of the job and Rob does 12/30 of the job.
12/20 = .6
12/30 = .4
Total = 1 job done.