123k views
5 votes
Expected cost per day if the average frame weight is reduced by 0.01

User Nalinc
by
7.7k points

1 Answer

6 votes

Final answer:

To calculate the expected cost per day with a reduction in average frame weight, we need more information on the total cost and the number of days. Without these details, it is not possible to determine the exact expected cost per day.

Step-by-step explanation:

To calculate the expected cost per day, we need to consider the average frame weight reduction of 0.01. Let's assume that the original average frame weight is X. So, the new average frame weight would be X - 0.01.

Now, let's say the manufacturing cost is $200 each. In this case, the expected cost per day would be the total cost divided by the number of days. Since we don't have the total cost or the number of days mentioned, we are unable to calculate the exact expected cost per day.

Therefore, without more information, we cannot provide a specific answer to the expected cost per day with the given reduction in average frame weight.

User Shadowspawn
by
8.6k points