Final answer:
The engineering staff undertook various efforts to evaluate the project, including defining requirements, brainstorming design solutions, and analyzing the selected design. The outcome was the selection of a solar still for desalination as the best design.
Step-by-step explanation:
Efforts Undertaken by Engineering Staff for Project Evaluation
The engineering staff undertook several efforts to evaluate the project. These efforts included:
Defining the project requirements and constraints
Brainstorming and generating potential design solutions
Evaluating the potential designs based on the requirements and constraints
Selecting one or more designs to be further developed and prototyped
Analyzing the selected design(s) in detail
Considering math and science connections related to the chosen design
Throughout the evaluation process, the engineering staff aimed to meet the project's requirements and constraints while choosing the best design. The outcome of these evaluation efforts was the selection of a solar still for desalination as the best design for the project. These insights and outcomes provided guidance for the project's progress and decision-making.