28.3k views
0 votes
machine-hours required to support estimated production 151,000 fixed manufacturing overhead cost $ 655,000 variable manufacturing overhead cost per machine-hour $ 4.30

User Ldrocks
by
8.1k points

1 Answer

4 votes

Final answer:

The machine-hours required to support estimated production is 152,325.

Step-by-step explanation:

The machine-hours required to support estimated production can be calculated by dividing the fixed manufacturing overhead cost by the variable manufacturing overhead cost per machine-hour.

Step 1: Divide the fixed manufacturing overhead cost ($655,000) by the variable manufacturing overhead cost per machine-hour ($4.30) to find the total machine-hours required.

Result: 655,000 / 4.30 = 152,325 machine-hours

User Doug Stevenson
by
7.9k points