Engineering cost estimates are usually based on operating conditions that are considered?

1) Constant
2) Variable
3) Both constant and variable
4) None of the above

User Isen Ng
by
8.3k points

1 Answer

2 votes

Final answer:

Engineering cost estimates take into account both constant and variable operating conditions. The per-unit costs such as average cost, average variable cost, variable costs, and marginal cost are crucial in understanding production efficiency. Production technology is how raw materials are turned into finished products, affecting cost.

Step-by-step explanation:

Engineering cost estimates often involve both constant and variable operating conditions. Constant conditions refer to those that do not change over time, such as the cost of purchasing land. Variable conditions, on the other hand, can change, such as the cost of raw materials which can fluctuate based on market conditions. Therefore, the correct answer to the student's question is 3) Both constant and variable.

When considering per-unit costs in economics, we look at average cost, average variable cost, variable costs, and marginal cost. These are all measured on a per-unit basis and play an essential role in determining the overall cost efficiency of production processes. Production technology refers to the methods and processes used to convert raw materials into finished goods or services, which ultimately influences the costs.