Final answer:
Maya company's scope of work includes producing, installing, and training on the machine. The comprehensive project covers design, manufacturing, and integration into Shaw company's operations, emphasizing the need for an effective manufacturing system and cost-effective production technology.
Step-by-step explanation:
The scope of work for Maya company as engaged by Shaw company includes producing the machine, installing the machine, and training their employees on how to operate the machine. From a business and engineering perspective, this project is comprehensive as it not only requires the conception and manufacturing of a large machine but also entails the logistics of installation and the development of an effective training program for Shaw company's employees. This ensures that the technology is properly integrated into the company's operations.
The process tends to become more complex as the design phase completes because not only does the manufacturing system needs to be developed, but elements such as supplier relationships for components, manufacturing facilities for various parts, and even a marketing strategy need to be established.
The dynamics of choosing a production technology involve analyzing costs, and in the given case, a shift towards favoring more machine hours due to their lower cost is evident. Technology 3, due to its lowest total cost, suggests the emphasis on greater automation and lower labor inputs.