230k views
1 vote
How high can scaffolding be erected before an inspection is required?

User MFarooqi
by
8.7k points

1 Answer

0 votes

Final answer:

Scaffolding that is 10 feet or higher must be inspected by a competent person before it is used to ensure safety and prevent accidents.

Step-by-step explanation:

According to OSHA (Occupational Safety and Health Administration) regulations, scaffolding that is 10 feet (or 3 meters) or higher must be inspected by a competent person before it is used. The competent person is responsible for ensuring that the scaffold is erected and used safely. They will check for any defects, proper assembly, stability, and secure attachment to the building or structure.

Inspecting the scaffolding is crucial for the safety of workers and to prevent accidents or collapses. It helps identify any potential hazards and ensures that the scaffolding meets the necessary standards for supporting workers and equipment at elevated heights. It is essential to adhere to these regulations to maintain a safe working environment.

User Dominique Barton
by
8.0k points