The nurse working in a long-term care facility has joined a committee with the goal of implementing electronic medical records within the next six months. The committee is planning how best to prepare staff for the change. What type of change is occurring?

A) Planned change
B) Change by drift
C) Accidental change
D) Occidental change

1 Answer

2 votes

Final answer:

The type of change occurring in the long-term care facility as a result of a systematic and deliberate effort to implement electronic medical records is known as Planned change.

Step-by-step explanation:

The type of change occurring in the scenario described is known as A) Planned change. This involves a deliberate and collaborative effort to improve the current systems or processes. In this case, the committee has been formed with a specific goal in mind: to implement electronic medical records within a specified timeframe, which is indicative of a systematic approach to transformation within the long-term care facility. The staff is being prepared for this change through planned strategies, indicating an organized shift from the current paper-based record system to a new, digital system.

User Spoekes
by
7.7k points