Measurements should _____.

A) Always be accurate to six sigma levels
B) Measure cost, productivity, and schedule variances
C) Induce the parts to do what is good for the system as a whole
D) All of the above
E) A and B only

User Kalatabe
by
7.5k points

1 Answer

1 vote

Final answer:

Measurements should induce the parts to do what is good for the system. It suggests a systemic approach to measurement, while recognizing the importance of accuracy and variance tracking within specific contexts.

Step-by-step explanation:

Measurements should induce the parts to do what is good for the system as a whole. This concept emphasizes the importance of measurements providing informative feedback that can help improve the overall system, not just focusing on individual elements. It suggests a systemic approach to measurement.

While ensuring accuracy (including six sigma levels) and measuring cost, productivity, and schedule variances are part of a robust measurement system, it is most crucial for the measurements to contribute positively to the efficiency and effectiveness of the entire system. That said, options A and B have their own importance within certain contexts, such as quality management with six sigma or project management with cost and schedule tracking.