Final answer:
The prime cost is the sum of direct materials and direct labor, which in this case is $73,500.
Step-by-step explanation:
The prime cost is the sum of direct materials and direct labor, which are the costs directly associated with the production of goods or services. In this case, the direct materials cost is $44,600 and the direct labor cost is $28,900. To calculate the prime cost, simply add these two values together:
Prime cost = Direct materials + Direct labor
Prime cost = $44,600 + $28,900 = $73,500