amy xia's plant is designed to produce 8000 hammers per day but is limited to making 6000 hammers per day because of the time needed to change equipment between styles of hammers.

User Malcor
by
7.8k points

1 Answer

6 votes

Final Answer:

Amy Xia's plant loses 25% of its potential production due to equipment changeover time.

Step-by-step explanation:

Amy Xia's plant hums with potential, but equipment changes throw a wrench in the works. Let's calculate the percentage of hammer production sacrificed to these switch-ups.

Calculate the potential production lost: 8,000 hammers (potential) - 6,000 hammers (actual) = 2,000 hammers lost

Divide the lost production by the potential production and multiply by 100% to express as a percentage: (2,000 hammers / 8,000 hammers) * 100% = 25%

Therefore, Amy Xia's plant experiences a 25% reduction in its daily output due to equipment changeover time. This highlights the potential impact of inefficiencies in production processes.

"

Complete Question

Amy Xia's plant is designed to have a daily production capacity of 8,000 hammers. However, due to the time required to switch equipment between different hammer styles, the plant actually produces only 6,000 hammers per day. What is the percentage of potential production that is lost due to equipment changeover time?

"

User Sunday G Akinsete
by
8.3k points