178k views
2 votes
To reach an underground methane gas well, workers dig a rectangular trench 6 feet wide, 8 feet long, and 9 feet deep. How many cubic feet of dirt did they remove from the trench?

User Plsgogame
by
8.2k points

1 Answer

3 votes

Final answer:

To calculate the dirt removed for the gas well, multiply the trench dimensions (6 ft by 8 ft by 9 ft) to get a volume of 432 cubic feet.

Step-by-step explanation:

The amount of dirt removed from a trench to reach an underground methane gas well can be calculated by finding the volume of the trench. Given the dimensions of the trench are 6 feet wide, 8 feet long, and 9 feet deep, we use the formula for the volume of a rectangular prism, which is length × width × height.

So the volume of dirt removed is 6 ft × 8 ft × 9 ft = 432 cubic feet. This represents the amount of dirt that workers would need to remove to dig the trench to the specified dimensions.

User Getzy
by
8.0k points
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.