46.9k views
4 votes
Program control uses what system to assign a requisition priority for each requisition?

User Adnan
by
7.2k points

1 Answer

1 vote

Final answer:

Program control uses a classified system to assign a requisition priority based on factors such as urgency, importance, and operational need, which is integral to efficient logistics and supply chain management.

Step-by-step explanation:

Program control assigns a requisition priority for each requisition based on a classified system. This system is designed to determine the order in which requisitions should be fulfilled based on urgency and importance to an organization's operations. Priorities are usually set using a coding scheme that can include factors such as mission criticality, stock levels, and anticipated deployment dates.

For example, in a military context, this could involve an alphanumeric code that specifies not only the urgency of need (ranging from routine to immediate), but also the force or mission that the material supports. This ensures that resources are allocated efficiently, giving preference to requisitions that are vital for the most sensitive and timely operations. The priority system is a key aspect of logistics and supply chain management, allowing for strategic planning and execution.

User Yuwang
by
7.8k points