Amount of testing performed will not depend on

A. Risks involved
B. Contractual requirements
C. Legal requirements
D. Test data

User Charm
by
7.6k points

1 Answer

1 vote

Final answer:

The amount of testing performed in a project is influenced by risks, contractual and legal requirements, not by test data, which serves as a means to execute test cases. Hence the correct answer to the question would be D. none of the above, as the options provided do not affect the extent of testing.

Step-by-step explanation:

When considering the factors that determine the amount of testing performed in a project, it’s important to distinguish between influences that directly affect testing scope and those that do not. Testing is an integral part of quality assurance and risk management in any project development lifecycle. Risks involved, contractual requirements, and legal requirements are typically the factors that directly dictate the extent of testing necessary. These factors help to ensure that the product or system is reliable, secure, and compliant with the applicable standards and regulations.

On the other hand, test data itself is a tool used within the testing process and generally does not influence the decision of how much testing should be performed. Instead, test data is created or obtained to execute the test cases and validate the functionality of the product or system. Hence, if we look at the options provided (a. individual performance cannot be evaluated, b. the task is easy, c. both a and b, d. none of the above), the most applicable statement concerning the influence on the amount of testing is option D. none of the above.

Testing strategies are designed to respond to the risks, obligations, and legalities that are part of the project’s ecosystem, and not based on the ease of tasks or evaluation of individual performance, which are more related to operational execution rather than strategic planning.