What is the purpose of test completion criteria in a test plan:

A. To know when a specific test has finished its execution
B. To ensure that the test case specification is complete
C. To set the criteria used in generating test inputs
D. To know when test planning is complete
E. To plan when to stop testing

User Eric Farr
by
7.8k points

1 Answer

3 votes

Final answer:

The purpose of test completion criteria in a test plan is to determine when to conclude the testing phase, based on reaching predefined measurable targets. These criteria follow an evaluation against specifications to ensure the design meets all constraints and performance requirements. Proper test completion criteria ensure resource efficiency and goal attainment.

Step-by-step explanation:

The purpose of test completion criteria in a test plan is to plan when to stop testing. This involves establishing clear, measurable targets that the testing process must meet before considering the testing phase complete. The criteria may include factors such as the percentage of test cases executed, the criticality of remaining defects, and reaching a certain level of test coverage. Since prototypes are key to testing the functionality of a design, it is important that they meet all the constraints and perform acceptably relative to predefined criteria. These criteria must be evaluated against specifications to ensure that testing provides the necessary confidence in the product’s design and function. Establishing these criteria ensures efficient use of resources and that design goals are met without unnecessary expenditure of time and effort.