141k views
1 vote
After the first 2 hours, at what temperature must a TCS food be cooled from and within how long?

User Janm
by
7.9k points

1 Answer

7 votes

Final answer:

TCS foods should be cooled from 60°C (140°F) to 4°C (40°F) within six hours, with the food first being lowered to 21°C (70°F) within the first two hours, and then to 4°C within the next four hours to ensure food safety.

Step-by-step explanation:

When cooling Time/Temperature Control for Safety (TCS) foods after the first two hours, the temperature must be lowered from 60°C (140°F) to 4°C (40°F) within a total of six hours. Initially, the food must be cooled from 60°C to 21°C (140°F to 70°F) within two hours and then from 21°C to 4°C (70°F to 40°F) within the next four hours. This two-stage cooling process is critical to prevent the rapid multiplication of bacteria and ensure food safety. It's essential to use a food thermometer to monitor the food's temperature during this process.

User Lucas Ferreira
by
7.8k points
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.