Answer:
the Predetermined overhead rate is $95 per machine hour
Step-by-step explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate is
= (Estimated manufacturing overhead cost ÷ Estimated machine hours)
= ($760,000 ÷ 8000)
= $95 per machine hour
Hence, the Predetermined overhead rate is $95 per machine hour