160k views
9 votes
Bettendorf Corporation uses a job order costing system. The plantwide predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. Job B-600 has the following cost information: Direct materials $ 210 Direct labor $ 180 Required: 1. What is the total manufacturing cost assigned to Job B-600

User Ko
by
8.2k points

1 Answer

10 votes

Answer:

Missing word " 2. If Job B-600 consists of BO units, what is the unit product cost for this job?"

1. Particulars Amount

Direct Materials $210

Direct Labor $180

Plantwide overheads $315

Total manufacturing cost $705

Labor hour rate is $12 per hour

Hence, total labor hours = $180/$12 = 15 hours

Total plantwide overheads = $21 * 15 =$315

2. Particulars Amount

Direct Materials $210

Direct Labor $180

Plantwide overheads $315

Total manufacturing cost $705

Total unit 80

Cost per unit $8.813

User Adam Hoffman
by
7.5k points