Total estimated manufacturing overhead is $900,000 and total activity is 30,000 machine-hours. The plant wide overhead rate is $_____ per machine hour.

User Daveswen
by
8.6k points

1 Answer

7 votes

Final answer:

The plant wide overhead rate is calculated by dividing the total estimated manufacturing overhead ($900,000) by the total machine-hours (30,000 hours), resulting in $30 per machine hour.

Step-by-step explanation:

The question is asking to calculate the plant wide overhead rate based on the estimated manufacturing overhead costs and the total machine-hours available. To find the overhead rate per machine hour, you simply divide the total estimated manufacturing overhead by the total number of machine-hours.

Using the information provided:

Total estimated manufacturing overhead = $900,000

Total machine-hours = 30,000 hours

Plant wide overhead rate = Total estimated manufacturing overhead / Total machine-hours

Plant wide overhead rate = $900,000 / 30,000 hours

Plant wide overhead rate = $30 per machine hour