171k views
5 votes
The computer systems of N employees of a company are arranged in a row. A technical fault in the power supply has caused some of the systems to turn OFF while the others remain ON. Because of this, the employees whose systems are OFF are unable to work. The company does not like to see its employees sitting idle. So bh til the technical team can find the actual cause of the breakdown, the technical head Adam has devised a temporary workaround for the OFF systems at a minimum cost. Adam decides to connect all the OFF systems to the nearest ON system with the shortest possible length of cable. To make this happen, he calculates the distance of each system from the first system.

1 Answer

1 vote

Final answer:

The question is about devising a temporary solution to connect computers affected by a power supply fault to the nearest functional system with the least amount of cable. It is relevant to Computers and Technology at the College level and includes understanding electric circuits and efficient resource allocation.

Step-by-step explanation:

The question poses a practical problem related to computer systems and power supply in a workplace scenario. It falls under the subject of Computers and Technology, as it involves understanding the technical aspects of computer system connectivity and power requirements. The level of the question implies it is fit for College level, where students would be engaging with more complex problem-solving and technical solutions.

In the case presented, a technical fault has occurred causing some computer systems to turn OFF, necessitating the connection of these systems to the nearest ON system, using the shortest possible length of cable. This reflects a real-world scenario where computing resources are vital for productivity, and an immediate temporary solution is required to maintain operational efficiency until a permanent fix is made. Knowledge of electrical circuits, distance measurement, and cost-efficient solutions would be essential to solve this problem effectively.

To provide the optimized solution that Adam, the technical head, seeks, one needs to understand electric circuits, series circuit repercussions on equipment, and how to plan and execute wired systems effectively to ensure all OFF systems are connected with minimal resources and costs until full functionality is restored.

User Imran Ahmad Shahid
by
7.4k points