Answer:
Production (manufacturing) Lead Time per batch
Production Lead Time = Total Time required to manufacture which includes Setup time, Movement time, Inspection Time, Processing Time and Wait Time.
Decision Alternative 1: 166 Minutes
Decision Alternative 2: 154 Minutes
Process Cycle Efficiency
PCE = Value Added Time / Cycle Time
Except Processing Time all are Non Value Added
Decision Alternative 1 = 80/166 = 0.48
Decision Alternative 2 = 60/154 = 0.39