Answer:
A.$31.2 per hour
B. Factory Overhead Cost Per Unit
Flutes $24.96
Clarinets $43.68
Oboes $32.74
Factory Overhead Cost
Flutes 52,416
Clarinets 34,944
Oboes 40,560
Step-by-step explanation:
A. Calculation to Determine the single plantwide overhead rate.
First step is to calculate the Total Hours
Total Direct Labor Hours
Flutes 2100 units *0.8 hour per unit= 1,680
Clarinets 800 units *1.4 hours per unit = 1,120
Oboes 1300 units *1.0 hour per unit= 1,300
Total Hours 4,100
Now let calculate the Plantwide overhead rate using this formula
Plantwide overhead rate = Total Overhead Cost / Total labor hours
Let plug in the formula
Plantwide overhead rate=$127,800/4,100
Plantwide overhead rate=$31.2 per hour
Therefore Plantwide overhead rate will be $31.2 per hour
B. Calculation to determine the amount of total and per-unit overhead allocated to each of the three products.
Product Total Labor Hours Total Overhead Overhead Per Unit
Flutes 1,680 52,416 (1,680*31.2) $24.96 (52416/2100)
Clarinets 1,120 34,944(1,120*31.2) $43.68 (34,944/800)
Oboes 1,300 40,560
(1,300*31.2) $32.74 (40,560/1,300)
Total 4,100 127,920 $101.38
Therefore Factory Overhead Cost Per Unit and Factory Overhead Cost Will be:
Factory Overhead Cost Per Unit
Flutes $24.96
Clarinets $43.68
Oboes $32.74
Factory Overhead Cost
Flutes 52,416
Clarinets 34,944
Oboes 40,560