106k views
2 votes
How long does it take for a cheetah to run 100(m) meters at its top speed of 70(km/h) kilometers per hour?

User Benny Wong
by
7.1k points

1 Answer

7 votes

Final answer:

It takes the cheetah 5.14 seconds to run 100 meters at its top speed of 70 kilometers per hour.

Step-by-step explanation:

To calculate the time it takes for a cheetah to run 100 meters at its top speed of 70 kilometers per hour, we need to convert the speed from kilometers per hour to meters per second.

70 km/h = 70 * 1000 m/3600 s = 19.44 m/s

Now we can use the formula:

Time = Distance / Speed

Time = 100 m / 19.44 m/s = 5.14 seconds

User Pallavi Sonal
by
8.2k points