Answer:
The work done is 3645.6 J or 3.6 kJ
Explanation:
M1 = (0.5 kg/m)(12 - x m) = (6 - 0.5x) kg
At the height of x meters (0<=x<=12), the mass of the rope is,
M2 = (36kg/12m)(12 - x m) = (36 - 3x m) kg
At the height of x meters (0<=x<=12), the mass of the water is,
M3 = 10 kg
The mass of the bucket is 10 kg
Then, Total mass M is,
M = M1 + M2 + M3 = (6 - 0.5x) + (36 - 3x) + 10 = (52 - 3.5x) kg
From Force F = mass m * acceleration due to gravity g
Force = mass x gravity
F = 9.8(52 - 3.5x) Newtons
To get the work done W,
Follow the attached file,
The work done is 3645.6 J or 3.6 kJ